Puente Power Project
VENTURA COUNTY APCD FINAL DETERMINATION OF COMPLIANCE (FDOC)
In accordance with Ventura County APCD Rule 26.9, “New Source Review- Power Plants”, and Rule 26.7, “New Source Review - Notification”, notice is hereby given that a final decision has been made to issue a Final Determination of Compliance (FDOC) to the Puente Power Project (Application No. 00013-370). This project proposes the installation of a nominal 262 megawatt natural gas-fired combustion turbine as a replacement for existing electrical steam generating units at the Mandalay Generating Station at 393 North Harbor Boulevard in Oxnard, CA.
This project is expected to meet the requirements of Rule 26, “New Source Review”, and all other applicable District rules and regulations, including applicable state and federal requirements that the District implements and enforces. The FDOC includes conditions required to ensure compliance with these requirements.
Any questions regarding this FDOC should be directed to Ali Ghasemi, Engineering Division Manager, at (805) 303-4016.
PUENTE POWER PROJECT
DocumentsAPPENDIX A CURRENT PERMITTED EMISSIONS APPENDIX C COMMISSIONING SCHEDULE APPENDIX D HISTORICAL FUEL RECORDS APPENDIX E ERCS IDENTIFIED FOR POSSIBLE USE APPENDIX G AMBIENT AIR QUALITY ANALYSIS AND RISK MANAGEMENT REVIEW APPENDIX H HAZARDOUS AIR POLLUTANT POTENTIAL TO EMIT APPENDIX I CERTIFICATION OF STATEWIDE COMPLIANCE APPENDIX J ANALYSIS OF ALTERNATIVES APPENDIX K FINAL DOC CONDITIONS APPENDIX L PDOC COMMENT LETTERS APPENDIX M RESPONSES TO PDOC COMMENT LETTERS
|
|
All text and images © Copyright, 2006 by Ventura County Air Pollution Control District Site design by VCAPCD Information Systems Division E-mail Webmaster - Privacy Policy - Cookie Policy |